Ruifa Modular House Ruifa Modular House

68 Sqm Prefab House Prefabricated House with EPS Sandwich Panel

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Information
Model NO.
QDSM-192
Surface Treatment
Galvalume, Az275
Material Grade
G550/G350
Insulation
Polyurethane, Rockwool, Glasswool, EPS
Wind Load
285 Km/Hour (180 Miles/Hour)
Snow Load
Max. 200 Kg/Sqm
Earthquake Scale
Ritcher 8
Warranty
5 Years
Usage
Dormitories, Warehouse, Villa, Offices, Workshop
Product Description

68 SQM Prefab house with EPS sandwich panel

SizeAs per client requirements
StructureSteel base: Q235, hot galvanized. 2mm power coated main beam, 1.5mm second beam. Column: 3mm steel, Q235 hot galvanized.
Wall Panel50mm Glass wool sandwich panel/EPS
Roof SystemColor steel sheet + 40mm glass wool insulation + ceiling
Floor16mm MgO Panel with 2mm vinyl sheet
Window & DoorAluminum Sliding window; Steel door with handle lock and keys
Electrical System220V/50Hz system with distribution box, industrial plugs, lights, and sockets
Key Advantages
Earthquake resistance: Withstands up to level 9 seismic intensity.
Wind resistance: Resistant to 70m/s hurricanes (280km/H).
Durability: Main structure lifespan exceeds 50 years.
Sound insulation: External walls reach 75dB, inner walls 55dB.
Energy-saving: 65% more efficient than traditional buildings.
Fast Construction: Assembly is simple and saves 2/3 the usual time.
Product Visuals & Design
Design Capability:
Utilizing Auto CAD, PKPM, 3DMAX, SAP2000, Tekla, and Vertex, we provide professional design solutions tailored to specific project requirements.
Production & Quality Control

Our facility includes 40,000 SQM of specialized workspace equipped with CNC Flame Cutting, H-profile lines, and automated sandwich panel production lines. All processes follow ISO 9001 and CE standards.

Installation & Logistics
Frequently Asked Questions
1. What information is needed to build a prefab steel villa? If you have a layout, that's ideal. If not, please provide local wind speeds, snow loads, building dimensions (WxLxH), and seismic requirements so we can design it for you.
2. How long does it take to build a light steel prefab house? It depends on size. Generally, a 50 sqm house can be installed by 5 workers in approximately 1-3 days, significantly saving time and labor.
3. Is a steel villa stable during extreme weather? Yes, these houses are engineered to be safe even in hurricanes of up to 200km/h and grade 9 earthquakes.
4. Can these buildings be used for purposes other than residential? Absolutely. They are suitable for hotels, offices, schools, clubs, and light industrial workshops.
5. What are the advantages over traditional construction? Key benefits include superior heat and sound insulation, better fire resistance, faster assembly, and increased usable interior area.
6. What is the typical delivery time? Delivery usually takes 25-30 days after receiving the deposit, depending on the order volume.

Related Products