Ruifa Modular House
| Model NO. | Customization |
| Installation | Standard / Fast & Easy Assembly |
| Key Features | Earthquake Resistant, Easily Movable, Eco-Friendliness, Flexibly Combinable, Leak Proof, Moisture Proof, Safe, Thermal Insulation, Waterproof, Wind Resistance |
| Material | Sandwich Panel |
| Main Scene | Temporary Living / Construction Residence |
| Specifications | Multi-Storey, Customizable |
| HS Code | 9406 |
| Production Capacity | 50,000 Square Meters |
| Package Size | 118.00cm * 220.00cm * 24.80cm |
| Package Gross Weight | 8000.000kg |
| Transport Package | Bulk Loading |
Steel-structured prefab buildings represent an industrial construction breakthrough. Using high-strength steel, precision panels, and modular assembly, they redefine efficiency. Engineered for rapid deployment, they offer 40% faster on-site erection than traditional builds. They possess significant load-bearing capacity and durability, withstanding 160km/h winds and magnitude 7 quakes.
| Application Scope | Office, toilet, bathroom, changing room, school, classroom, library, shop, meeting room, canteen, guard house, camp dormitory, camp hotel, playground, resort area, earthquake relief, etc. |
| Fast Installation | 4-8 hours per set per person, significantly saving labor costs. |
| Anti-Rust | All materials utilize galvanized steel. |
| Protection | Waterproof (steel ceiling/wall/floor) and Fireproof (Grade A fire rating). |
Project Implementation
We strictly implement factory processing and on-site construction according to national and industry standards to meet the specific needs of users.
The company is a comprehensive enterprise integrating trade and manufacturing. Leveraging multiple specialized factories, we have established a robust production and supply system focusing on delivering high-quality integrated housing products to global customers.
Our core business includes research, development, production, and sales of container houses, light steel prefabricated houses, large-scale steel structure factories, and modular K and T houses. Our products are exported to Europe, Africa, Southeast Asia, the Middle East, and beyond, earning widespread acclaim for reliable quality and excellent service.