Ruifa Modular House Ruifa Modular House

Prefabricated Steel Structure Labor Camp Prefab House

Customization: Available
Purlin Type: C/Z Galvanized Purlin
Material: Q235B or Q345b

Product Description

i

Basic Info

Model NO.:Customizable
Roof Sheet:EPS or Galvanized Color Plate
Wall Sheet:EPS or Galvanized Color Plate
Door:Rolling Door Composite Door
Windows:PVC
Delivery Date:30 days
Steel Type:Quality Carbon Structural Steel
Connection:Bolt Connection
Carbon Steel:Q235
Application:Steel Workshop, Platform, Fabricated House, Roofing
Capacity:200,000 m2/Year
HS Code:94069000

Product Description

Prefabricated Steel Structure Labor Camp Prefab House

Technical Specification

Main Material (Standard House)
No.Part NameMaterialDescription
1Ground channelC shape steelC80x40x15x2.0
2ColumnDouble C shape steel2C80x40x15x2.0 welded
3Beam (2nd Floor)Steel frame2C80x40x15x2.0\L40x4 welded
4Sub-beamC shape steelC80x40x15x2.0
5PurlinCorner steelL40x4
11Wall panelEPS sandwich panel50mm thickness, 0.3mm plate
13Roof panelEPS sandwich panel50mm thickness, 0.3mm plate
16WindowsPVC sliding windows0.93m x 1.00m
17DoorSandwich panel door0.93m x 2.00m
Prefab House Structure
Prefab House Detail

Our Advantages

Long History & Experience: Founded in 1999 with over 50,000 sqm factory area. Rich experience in 20+ countries.
Professional Production: 10 production lines with advanced equipment maintained by professional technicians.
Wide Product Range: Includes light steel workshops, warehouses, hangars, and space frames.
Design Excellence: Team of 25 engineers and 14 designers familiar with all steel structure projects.
Quality Management: ISO 9001 certified with strict standards for finished product testing.
Production Advantage
Quality Check

Technical Parameters & Materials

Prefabricated houses use light steel as the structure and sandwich panels for walls and roofs. Components are connected by bolts for easy assembly.

Service life: More than 20 years
Assembly: Can be assembled/disassembled more than 6 times
Floors: Up to 3 storeys
Wind resistance & Load: Live load 0.5kn/m2, Bearing load 30kg/m2

Material Showcase

Materials 1
Materials 2
Materials 3

Packing & Workshop

Packing and Loading
Workshop Corner 1
Workshop Corner 2

Business Partners

Business Partners
?

Frequently Asked Questions

Q1: What materials are used for the prefab house wall and roof?
We use high-quality sandwich panels with insulation options including EPS (Polystyrene), Polyurethane, Rock Wool, or Fiber Glass.
Q2: How durable is the prefabricated steel structure?
The service life of our prefab houses is more than 20 years, and the structure is designed to be assembled and disassembled more than 6 times.
Q3: What is the typical delivery time for an order?
Standard production and delivery usually take between 20 to 30 days depending on the project specifications.
Q4: Can the size of the house be customized?
Yes, length, width, and height are all customizable. We recommend sizes based on your specific use case (e.g., labor camp, office, or warehouse).
Q5: Are these houses suitable for multi-storey buildings?
Our standard prefabricated system supports up to 3 floors with appropriate steel frame reinforcement.
Q6: What accessories are included in the package?
The package can include electric cables, PVC wire channels, lights, switches, sockets, and even sanitary components like shower rooms if required.

Related Products