Q1: How long does it take to install one unit?
One standard unit can be installed by 6 skilled workers within 30 to 90 minutes, thanks to the prefabricated design.
Q2: Can these container units be stacked?
Yes, our galvanized steel structures are designed for strength and can be safely stacked up to 3 floors high.
Q3: What types of insulation are available for the walls?
We offer multiple options including EPS, IEPS, and Rock wool sandwich panels to suit different climate requirements.
Q4: Are the units resistant to rust?
Yes, the entire steel frame is fully galvanized, providing excellent protection against corrosion and environmental wear.
Q5: Can units be combined into larger spaces?
Absolutely. The modular design allows multiple units to be jointed together to create larger halls, offices, or meeting rooms.
Q6: What certifications do these products hold?
Our prefabricated containers are certified by CE, ISO, and SGS, meeting international standards for safety and quality.